Ascot Flood Prevention Trash Grille

Welding-image-3-Trash-Grille

Ascot Flood Prevention Trash Grille

Project: Ascot Flood Prevention Trash Grille
Client: R&W Civil Engineering Ltd

As part of a programme of flood management works in Ascot, our client undertook a schedule of works including the resculpting of existing waterways and the creation of two new brick headways.

To complete the works, our customer required a pair of large, made to measure trash screens capable of withstanding significant pressure from water flow and bulky debris. The 6ft trash screens were fabricated from mild steel flat welded into an angle iron frame supported on UC legs, with an open flooring panel top section to allow for access all with galvanised finish.